Project Story · Precast Block

Sandie Dix Wall: A 60-Foot Precast Block Wall Between Neighbours, Built by Hand

Sixty feet of patchwork wall, a 4 to 10 ft drop between two yards and no way in for a machine: how the old wall left by wheelbarrow and a pinned Hewnstone block wall went in by hand.

Project storyUpdated November 26, 20267 min read
Free consultation & estimate Toronto & York Region Natural stone, precast & small block Not our trade? We’ll refer you

The Sandie Dix wall is a retaining wall between neighbours that Top Mark rebuilt entirely by hand. Sixty feet of failing patchwork wall held back a grade that dropped 4 to 10 feet along its length between two properties. With no access for equipment, the old wall was demolished and carried out by wheelbarrow, and a new Oaks Precast Hewnstone block wall went in by hand, with drainage pipe, filter fabric, gravel-filled cores, fibreglass pins and geo-grid every 2 feet of height.

Here is how the job came together, from the two neighbours’ concerns to the layers behind the finished face, and what it shows anyone facing a shared wall, a tight lot or a tall grade. Every project detail comes from our own job notes and site photos. The type of wall is covered in depth on our precast block retaining walls page.

Project at a glance

DetailSandie Dix wall
Length60 ft, between two neighbouring properties
Grade change4 ft to 10 ft along the length of the wall
BeforeA hodgepodge of natural stone, pieces of concrete and cement, reinforced with old pipe and wood
ConcernsErosion and the integrity of the old wall; a forsythia hedge on the high side; a garden on the low side
AccessHomes built close together on single shared driveways; no room for equipment
MethodDemolished and rebuilt by hand; every material in and out by wheelbarrow
BlockOaks Precast Hewnstone, a hollow block with a smooth decorative face
LockingYellow fibreglass pins; hollow cores filled with clear gravel
DrainageDrainage pipe and filter fabric behind the wall
ReinforcementGeo-grid mesh every 2 ft of wall height

The problem: a patchwork wall between two yards

The old wall had grown in pieces. Natural stone, broken concrete and cement had been stacked along the boundary and propped with lengths of old pipe and wood. A wall built that way has no designed base, no drainage and nothing tying it back into the soil, and on this site it was holding up to 10 feet of grade. Both neighbours were worried about erosion and about whether the structure would keep standing.

Old boundary retaining wall of loosely stacked stone and rubble behind a garden bed with rhododendrons
Before: loose stone and rubble along the boundary.
Moss-covered patchwork of stones and cracked concrete in the old retaining wall
Before: stone, concrete and cement patched together.

Two neighbours, two different worries

A retaining wall between neighbours has two owners to answer to. The homeowner on the high side was worried about damage to the existing forsythia hedge above the wall. The neighbour on the low side was concerned that her garden would be trampled while the wall was rebuilt. Both concerns had to be addressed in how the job was planned and run.

Working by hand suited both concerns: no machine tracked across either yard, and the old wall was taken apart carefully instead of being pulled down.

No machine access: building 60 feet by hand

The houses on this street were built close together and share single driveways, so there was no route for an excavator or a skid steer to reach the wall. Everything had to move on foot.

  • The old wall was demolished carefully and removed by hand.
  • The old stones and debris left by wheelbarrow.
  • Every new block came in by wheelbarrow and was placed by hand.
  • The base gravel and all backfill were brought in and installed manually.

That is why the block choice mattered. A hollow block like Hewnstone can be carried and set by a crew, then gets its weight and much of its strength once its cores are filled with clear gravel. Solid mass blocks of the kind used on some tall walls need a machine to place. The extra labour of hand work is a real cost on jobs like this; our retaining wall cost guide explains how limited access affects a quote.

Piles of stone and gravel on the ground beside wooden pallets on the Sandie Dix job site
Build: stone and gravel on site, moved by hand.
First pinned Hewnstone block set beside drainage pipe and filter fabric, with a plate compactor in the trench
Build: the first course on its compacted base.

Stepping the wall with the slope

The ground fell along the boundary, so the wall couldn’t be one height. The slope of the property meant the wall had to be tallest at the bottom of the garden and step up with the incline of the land. Stepping the base this way keeps every course level, puts the most wall where the most soil has to be held, and avoids building a 10-foot wall where 4 feet will do.

A wall with this much grade change is the kind that calls for careful design. In Ontario, a retaining wall more than 1 m (about 3′3″) in exposed height next to public property, a building access or private property the public can enter generally needs a building permit and a professional engineer’s design. Our Toronto retaining wall permit guide covers property-line walls and when to involve the municipality.

What’s behind the face

The layers behind this wall are what will keep it standing:

  1. Gravel baseBrought in by hand and installed under the first course.
  2. Filter fabricLaid against the excavated bank so soil can’t wash into the drainage stone.
  3. Drainage pipeRun behind the wall to carry ground water away instead of letting it press on the blocks.
  4. Pinned hollow blockOaks Precast Hewnstone, each course locked to the one below with yellow fibreglass pins.
  5. Clear gravel in the coresFilling the hollow blocks adds weight and strength to the wall and lets water drain through it.
  6. Geo-grid every 2 feetMesh placed at every 2 ft of wall height and run back into the backfill for tieback strength along the full length.
Hollow Hewnstone blocks with yellow fibreglass pins rising in front of black filter fabric
Build: pinned, hollow block going up.
Tall Hewnstone wall rising course by course with filter fabric against the bank behind
Build: the wall rising course by course.

For a closer look at each drainage layer, see our retaining wall drainage guide.

The finished wall

The finished Hewnstone wall runs the full 60 feet, stepping up with the garden, with its smooth decorative face toward the low side.

Planning a retaining wall between neighbours

Shared walls bring questions a wall in the middle of one yard doesn’t. From this project, the things worth settling early:

  • Talk to both owners first. Agree what is being built, how the work will reach the wall and what each side wants protected.
  • Know where the line is. A survey shows where the property line runs relative to the wall. For who owns or maintains the wall, get advice and put any agreement in writing.
  • Protect both gardens. Plan where materials go and how plantings on each side will be kept safe.
  • Plan for the access you have. No machine access means hand-built methods and blocks that can be carried.
  • Send the water somewhere sensible. Drainage from the new wall shouldn’t become the neighbour’s new problem.

Toronto’s property standards rules require retaining walls to be structurally sound and properly maintained, so a failing boundary wall is worth dealing with before it moves further. If you’re unsure whether an old wall can be saved, our retaining wall repair page sets out the signs. We build walls like this across Toronto and York Region, from North York and Thornhill to Richmond Hill.

Sharing a failing wall with a neighbour?

We’ll look at the wall from both sides and explain the options. The visit is free.

Get a Free Estimate

Questions about this project

Can a retaining wall be built without machine access?

Yes, with the right block. On the Sandie Dix wall, the old wall was demolished by hand and every block, load of gravel and backfill came in by wheelbarrow. Hollow, pinned block such as Oaks Precast Hewnstone can be carried and set by hand, then filled with clear gravel for weight and drainage.

Who is responsible for a retaining wall between neighbours?

It depends on where the wall sits relative to the property line and on any agreement between the owners, so start with a survey and get advice if it’s unclear. Toronto’s Property Standards By-law requires owners to keep retaining walls structurally sound. Put any shared-cost or access agreement in writing before work starts.

What is Hewnstone block?

Hewnstone is an Oaks Precast retaining wall block: a hollow unit with a smooth decorative face. On this project each course was locked to the one below with yellow fibreglass pins, and the hollow cores were filled with clear gravel to add strength and help drainage.

Why fill hollow retaining wall blocks with gravel?

Clear gravel in the cores adds weight, which locks the courses together and makes the wall stronger, and it lets water drain down through the wall instead of building up behind it. It also means each block is light enough to carry in empty, which matters on a hand-built job.

Does a wall holding 10 feet of grade need an engineer?

Walls of that height generally need careful engineering. In Ontario, a wall more than 1 m of exposed height next to public property, a building access or property the public uses generally needs a building permit and a professional engineer’s design. Confirm the requirements with your municipality before work starts.