Retaining Walls · Newmarket

Retaining Walls in Newmarket: Walkouts, Pools & Gardens

Walkout terraces, driveway walls, pool surrounds and garden steps for Newmarket’s hilly lots, from Stonehaven and Woodland Hill to the streets around Fairy Lake.

Walkout & driveway wallsGeo-grid where it’s neededFree consultation
Free consultation & estimate Serving Newmarket & nearby Natural stone, precast & small block Not our trade? We’ll refer you

Retaining walls in Newmarket are usually about a drop: a walkout yard that falls a storey from the patio door to the back fence, a driveway cut into a rise, or a garden stepping down toward the East Holland River. Top Mark Property Improvements builds and replaces stone, large precast and small block walls for those lots, and works out the Town and conservation authority approvals as part of the plan.

Over 1 mWall height on the Town’s list of work that needs a building permit
0.6 mWater depth at which a pool or hot tub needs a Town enclosure permit
20 cmTrunk diameter at which Newmarket regulates a private tree

Walkout yards: how much wall does the drop need?

On a walkout lot the ground has to fall about 2.4 m (8′) somewhere between the front and back of the house. Some of that can be lawn. The rest needs walls: a return beside the patio door, a run along the side yard, or terraces across the slope. The height you are holding decides nearly everything else.

Height heldTypical layoutWhat it usually involves
Up to about 0.6 m (2′)One low garden or patio-edge wallSmall block or cut stone set by hand, a gravel base and a drain
0.6 to 1 m (2′ to 3′)One wall, or two short steps with plantingThe same, with closer attention to where the water goes and whether a lot line is near
1 to 1.8 m (3′ to 6′)A single engineered wall, or two terraces set well apartBuilding permit, engineered drawings and geo-grid into the bank
Over 1.8 m (6′)Large precast block, or wide terracesAll of the above, machine access and often a guard along the top
Three low tiers of dry-stacked natural stone with armour stone steps climbing beside them
Stone tiers and steps on the Sandy Dix garden wall.

Two low walls or one tall one

Terracing gives up some flat ground but leaves each wall lower, easier to drain and better looking. It only works if the tiers sit far enough apart; crowd them and an engineer will treat the pair as one wall. Stone steps between the tiers turn the slope into a route, not a barrier. See how armour stone and Eramosa walls handle this.

The ground under Newmarket

The East Holland subwatershed plan places Newmarket on the Schomberg Clay Plain, which runs from Holland Landing to Aurora: thick, fine-grained deposits, typically around 15 m, draped over rolling till. Valleys cut through it, and the plan calls the land between Newmarket and Holland Landing rough and much dissected. In plain terms, expect slow-draining soil and uneven lots.

The exception is the west side. On the Province’s Oak Ridges Moraine map, a strip of town along Bathurst Street, roughly from Davis Drive south, falls inside the moraine plan area. Ground there can turn sandy, and site alteration inside the plan area has to comply with the moraine plan.

  • On clay: the water behind the wall is the load to design for. We use clear stone, fabric and a pipe that runs to a lower outlet.
  • On sand: the risk is fine soil washing out, so the fabric has to be continuous and downspouts can’t empty behind the wall.
  • On fill: common beside newer foundations and walkouts. Loose fill settles, so the base goes down to firm ground or the engineer specifies something wider.

Driveway and side-yard walls

Where a garage sits below the street or the neighbour’s lawn is higher than your drive, the wall holds soil on one side and gets salt, snow and tires on the other. Block handles that better than timber, and it can be built in a strip not much wider than the trench.

First courses of hollow precast block beside an interlock driveway, with a coil of socked drain pipe and black filter fabric against the cut bank
Build: drain pipe and fabric behind the first courses of the Pinkus wall.
Black geo-grid laid across the top of split-face precast blocks and back into the bank beside an interlock driveway
Build: a layer of geo-grid ready to be covered, same wall.

The Pinkus driveway wall shows the sequence: an old brick-faced wall came out and a split-face block wall with geo-grid went in. For anything taller, or carrying a parking pad, look at engineered precast block walls. For a low border or a front bed, small block landscape walls cost less and go in by hand.

Pool and patio walls

A level pool deck on a sloping yard nearly always means a wall on the uphill side, the downhill side or both. The Town’s pool enclosure page says the permit comes before construction, and that a property’s grading must not be modified without municipal approval. On a road the Town hasn’t assumed yet, Engineering Services also has to sign a clearance letter. Sort out the wall, the fence line and the drainage together, because each one moves the others.

Grey precast block wall nearly at full height beside a backyard pool, with a red wheelbarrow of gravel on the stamped concrete deck
Build: block courses rising on the Perry pool deck, set without a machine.

Permits for retaining walls in Newmarket: what to check, in order

  1. Building permitThe Town’s building and renovating page lists “retaining walls greater than 1 meter in height”. It doesn’t limit that to walls beside public land, so call 905-953-5300 ext. 2400 even for a backyard wall.
  2. GradingSite Alteration By-law 2016-58 excuses sites under 0.5 ha from a permit if the work doesn’t affect drainage or slope stability next door and the site isn’t beside an environmentally protected area. The rest of the by-law still applies.
  3. River, creek and valleyThe same by-law bars work within 30 m of wetlands, significant woodlands, significant valley lands and streams without permission. LSRCA, the Lake Simcoe Region Conservation Authority, regulates grading and structures near them: 905-895-1281.
  4. TreesA private tree permit, normally with an arborist’s report, is needed before taking down a tree that measures 20 cm or more at 1.4 m up.
  5. New subdivisionThe Town advises against landscaping that could change drainage until the developer’s grading is certified.
  6. HeritageIn the Lower Main Street South district, ask the Town whether the wall needs a heritage permit.

In Ontario a building permit is generally required for a retaining wall over 1 m (about 3′3″) in exposed height that is next to public property, a building access or private property the public can enter, and walls like that must be designed by a professional engineer. For how neighbouring cities treat the same wall, see our retaining wall permit guide, and confirm your own case with the Town.

Newmarket by neighbourhood

Stonehaven, Wyndham and Copper Hills

Rolling south-east streets developed from the 1990s on. Look for walkouts, wide drives and walls now reaching the age where caps lift and drains clog.

Woodland Hill

A prominent, very hilly rise west of Yonge, built up from the 2000s. Grade changes between neighbours are common, so lot lines and swales matter.

Summerhill and Glenway

West-side lots near the moraine boundary. Houses sit close together in Summerhill, so plan on hand-set block; check the moraine map before regrading.

Main Street, Fairy Lake and Bogart Creek

Older lots, mature trees and flood plain. The first dam at Fairy Lake drove a mill in 1801; today it’s there for flood control, so expect LSRCA to weigh in.

Choosing a retaining wall contractor in Newmarket

Our office is in Toronto, at 3402 Bayview Ave, and we travel up through York Region. The first visit is for measuring the drop and looking at soil, drainage, access and whatever wall is there now. From us or anyone else, ask for an estimate that names the wall, the base, the drain outlet and who handles each approval, plus a sketch showing the distance to the lot line.

Not every wall needs replacing. A lifted cap, a blocked outlet or one slumped section can often be fixed; a wall that leans along its length or has rotten timber usually can’t. Our page on repairing or rebuilding a retaining wall lists the signs.

Coping stones stacked along the top of a long grey precast block wall while a paver walkway is laid behind it, with hand tools leaning on the house
Build: coping and pavers going down on top of the Kaivan wall.

What it costs, and when to start

Height is the biggest lever, because crossing 1 m brings in engineering, geo-grid and deeper digging. After that come access, removal, length and material. The guide to retaining wall prices in Ontario breaks it down per square foot and per linear foot. If you want to be building once the frost is out, our spring 2027 planning guide sets out a winter schedule, and the retaining walls overview is a good place to compare materials.

How big is the drop in your yard?

Tell us the height and length, or call 416.728.2159 and we’ll come and measure it.

Book a Free Visit

We also build just south of town: see retaining walls in Aurora, or King City retaining walls for larger rural lots to the south-west.

Questions Newmarket homeowners ask

When do retaining walls in Newmarket need a building permit?

The Town of Newmarket lists retaining walls greater than 1 metre in height among projects that need a building permit. Lower walls can still be caught by the site alteration by-law, LSRCA rules near water, the tree by-law or a subdivision’s grading plan. Email building.permits@newmarket.ca or call 905-953-5300 ext. 2400 before you build.

Do I need an engineer for a walkout retaining wall?

If any part of the wall shows more than about 1 m, plan on one. Walkout walls often carry extra load from a deck, stairs or a slope rising above them, which can call for engineering at lower heights too. An engineer’s drawing sets the block, base depth, geo-grid length and drainage.

My lot backs onto the East Holland River. Who do I call first?

Call the Lake Simcoe Region Conservation Authority at 905-895-1281 before the Town. It regulates grading, filling and structures near rivers, steep slopes and wetlands, and can tell you whether your yard is in its regulated area. Doing that first keeps you from paying for a design that can’t be approved.

Is Newmarket on the Oak Ridges Moraine?

Only partly. The provincial map puts a strip along the west side, near Bathurst Street, inside the moraine plan area; most of town lies outside it, on clay and till. If your lot is inside the line, grading and site alteration must comply with the Oak Ridges Moraine Conservation Plan, so check with Planning.

Can I build a retaining wall for a pool in Newmarket?

Yes, but line up approvals first. Pools that hold 0.6 m of water need an enclosure permit before construction, and the Town says grading can’t be changed without its approval. A wall over 1 m adds a building permit. We plan the wall, the deck level and the drainage together.

Can you replace a timber wall beside my driveway with block?

Yes. The timber and the wet soil behind it come out, a compacted gravel base goes in, and the new wall is built with filter fabric, clear stone, a perforated drain and geo-grid if the height calls for it. Small block suits low runs; large precast suits taller or loaded ones.

Will a new wall send water onto my neighbour’s lot?

It shouldn’t, and Newmarket’s site alteration by-law doesn’t allow grading that causes flooding or ponding next door. We keep the swale working, bring the drain out on your own property and shape the ground above the wall so runoff passes it without dropping onto the lower yard.