The first question about retaining walls in Aurora is whether the lot is on the Oak Ridges Moraine or below it. The moraine wraps the west side and south end of town with sandy, rolling slopes; the old village and most of the Bayview corridor sit off it, on finer soil that holds water. Top Mark Property Improvements builds natural stone, precast and small block walls for both, and replaces old ones that have had their day.
On the moraine or off it: what changes for your wall
The Province’s Oak Ridges Moraine map for Aurora and Newmarket draws the plan boundary as a deep U around the middle of town. It is worth finding your street on it before you sketch anything.
| Inside the plan area | Outside it | |
|---|---|---|
| Where | West side along Bathurst, including parts of Hills of St Andrew and Aurora Highlands, and the south end on both sides of Yonge | Aurora Village, the streets around Wellington and Yonge, and most of the Bayview corridor north of Wellington |
| Typical ground | Sand and gravel, with silty till along the crest | Till and clay plain, plus fill on newer lots |
| How walls get into trouble | Soil ravels out of cuts, washes through joints, or scours below a downspout | Water builds up behind the face, then freezes |
| Extra planning rule | Decisions must conform to the Oak Ridges Moraine Conservation Plan, with tighter limits near woods, wetlands and streams | None from the moraine plan; other rules still apply |
| Wall we’d look at first | Armour stone or terraced Eramosa, with fabric the full height | Any type, with a clear stone zone and a drain that empties downhill |
Much of the in-town moraine is mapped as Settlement Area, where houses and walls are normal. Natural Linkage, Natural Core and Countryside designations start toward the south-west and south-east, and grading there gets far more scrutiny. Both the line and the soil vary from lot to lot, so treat the map as a first look and the ground as the final word.
Holding a sandy slope in Aurora
The East Holland River subwatershed plan describes the moraine as rolling sandy hills, with surface sand and gravel as much as 90 m thick and a sandy till against its northern edge near Aurora. Dry sand drains beautifully and stands up badly. Cut it steeply and it runs, so the work goes best in short sections, backfilled as the wall rises, and an open cut shouldn’t sit through a storm.


The Sandy Dix garden wall in the photos replaced three rotten timber tiers with dry-stacked Eramosa bookended by armour stone. For a hillside that approach has real advantages: several low tiers disturb less slope than one tall cut, a dry-stacked wall lets water through, and it can shift slightly without cracking. Our natural stone wall page explains how the stones are chosen and set. On sand, we pay most attention to these details:
- Filter fabric lapped, with no gaps at the joints
- Downspouts piped past the wall, not into it
- A base wide enough to spread the load
- Planting or stone on the slope above, so it doesn’t wash
Heritage retaining walls in Aurora
The Northeast Old Aurora Heritage Conservation District, north of Wellington Street, protects a neighbourhood of 19th- and early 20th-century homes. Owners there need approval for exterior alterations, and the Town’s heritage permit guide names retaining walls directly, as an example of hard landscaping that typically needs a heritage permit. Minor work that follows the district plan can be approved by staff. The guide sends larger changes to the heritage committee and Council, so confirm the current steps with heritage planning staff and leave time for them.
The same thinking suits older streets outside the district. Low walls, stone that looks as if it could have come from a local field or quarry, coping with a plain edge, and steps wide enough for two people will sit better in front of a Victorian house than a high block face.

Replacing a tired wall in Regency Acres and Aurora Highlands
Regency Acres, within Aurora Highlands, has homes from the 1960s and 1970s, and walls put in by a first or second owner are overdue. Railroad ties go soft from the back, so they look fine until a spike pulls out. Dry block laid without fabric slowly empties its backfill. Thin concrete walls crack, then tilt. Our guide to retaining wall repair or replacement helps you judge which stage yours has reached.

Mature yards and no way in
Big trees, a narrow side gate and a finished garden often rule out a machine. The Sandie Dix wall, 60 feet long with a 4 to 10 foot change in level, was taken down and rebuilt entirely by hand in pinned hollow block with geo-grid every two feet. Good precast retaining wall block makes that possible; a one-tonne armour stone doesn’t.
Newer lots along Bayview: keep the drainage plan intact
East of Yonge, the Bayview corridor subdivisions were each graded to a plan the Town approved. Aurora’s lot grading and drainage brochure is blunt about what follows: once the subdivision is assumed, keeping that grading is the homeowner’s job, and new landscaping must not disrupt it. If it hasn’t been assumed, you need the developer’s engineer to agree before you build. The site alteration by-law also bars changing a grade set by an approved subdivision plan without a permit.
Two features catch people out. Side and rear swales are meant to stay open, so a wall or raised bed can’t simply cross one. And a rear-lot catch basin has a pipe running from it to the street sewer, which makes the spot where you’d like to dig a footing a place to locate first. A short small block garden wall set back from the swale is often the answer.

Approvals for an Aurora retaining wall
In Ontario a building permit is generally required for a retaining wall over 1 m (about 3′3″) in exposed height that is next to public property, a building access or private property the public can enter, and walls like that must be designed by a professional engineer. The rest depends on your street.
Grading and topsoil
Site Alteration By-law 6226-19 exempts small jobs only if fill stays under 300 mm deep and 50 m³, ground within 600 mm of the lot line is unchanged, and swales and neighbours’ drainage aren’t affected.
Guards and upkeep
Property standards require walls to be sound and plumb, with a guard where the drop is more than 1.2 m. Walls the Building Code treats as designated structures follow the Code instead.
Trees
Aurora’s private tree rules let you remove up to two trees over 20 cm in 12 months without a permit, but a heritage tree, or any tree in a heritage district, needs one.
TRCA’s own figures put only 4% of Aurora’s population in its area, so LSRCA is the likelier call, and the Province plans to fold both into larger regional bodies in early 2027. The Town’s Building Division (365-500-2081) and Engineering (engineering@aurora.ca) can confirm what your address needs. Our guide to retaining wall permits explains how the pieces fit, and we help with them while planning the wall.
From first call to finished wall
- Look at the groundWe check slope, soil, trees and access, and where the moraine line and lot lines fall.
- Agree on the wallType, height, tiers, steps and drainage, with a free estimate.
- Get the yesesPermits, engineering, heritage or conservation approval, only where they apply.
- Build and tidyOld wall out, new base and drain in, courses up, then coping, planting and clean-up.
Budgeting for a wall in Aurora
Face area sets the starting point. After that, sandy cuts that need to be opened in sections, hand-building behind mature trees and approval drawings push the figure up, while an open side yard and a wall under 1 m bring it down. Read what a retaining wall costs in Ontario for typical ranges, or see our main retaining walls page for the options.
Sand, clay or somewhere in between?
We’ll come and look. Call 416.728.2159 or send us the details.
Aurora areas we cover
- Aurora Village and Northeast Old Aurora
- Aurora Highlands and Regency Acres
- Aurora Heights
- Hills of St Andrew
- Town Park area
- Bayview Wellington
- Bayview Northeast
- South Yonge and the Bloomington area
Over the town lines, we also build retaining walls in Newmarket and estate retaining walls in King City.
Aurora retaining wall FAQ
Are permits required for retaining walls in Aurora, Ontario?
Often, for taller walls. Once the exposed height passes 1 m next to public property, a building access or private land the public can enter, expect to need a building permit and engineered drawings. Grading, heritage, tree and conservation rules can apply to lower walls, so ask Aurora’s Building Division first.
How do I know if my Aurora lot is on the Oak Ridges Moraine?
Start with the Province’s Oak Ridges Moraine land use map, which shows the plan boundary running down the west side of Aurora and across its south end. It isn’t precise at the lot level, so ask the Town’s planning staff to confirm your address and designation before you regrade.
Which retaining wall is best for a sandy moraine slope?
Armour stone or terraced natural stone is usually the first choice, because low, heavy, flexible tiers disturb less of the slope. Precast block works well too, on a compacted gravel base. Whatever the face, filter fabric behind it has to be continuous or the sand will wash out through the joints.
Does a retaining wall need a heritage permit in Old Aurora?
In the Northeast Old Aurora Heritage Conservation District, usually yes. The Town’s heritage permit guide gives retaining walls as an example of hard landscaping that typically requires one. Staff can approve minor work that fits the district plan; larger changes go to the heritage committee and Council.
Is Aurora under TRCA or LSRCA for retaining wall permits?
Mostly LSRCA, because most of Aurora drains to the East Holland River and Lake Simcoe. Parts of the south drain to the Humber and Rouge rivers, which TRCA regulates. Each has online mapping, so search your address, then call the authority that covers it before grading near a stream, wetland or steep slope.
Can I raise my backyard with fill behind a new wall?
Only within limits. Aurora’s by-law excuses small jobs from a site alteration permit if the fill is no deeper than 300 mm, totals no more than 50 cubic metres and stays out of the 600 mm strip along the lot line. Drainage onto neighbours can’t change. Beyond that, expect to apply.
How long does a timber retaining wall have left?
Push a screwdriver into the lower ties and the ends. If it sinks in easily, the wood is rotting and the wall is living on borrowed time. A lean, bulging rows or rusted spikes pulling out point the same way. Replace it before a wet spring rather than after one.